Since its introduction in the 1960s, coiled tubing (CT) has evolved from smaller sizes and a few cleanout jobs to larger diameters and heavier grades with higher flow rates. Some of the limiting factors, especially on offshore platforms, are limited crane-weight capability and poor weather conditions, which severely limit the size of the reel that can be lifted. With offshore crane capabilities as low as eight tons on some platforms, a CT reel is often transported in two or more sections, requiring offshore assembly. The virtual test, selected virtual- test results, physical results from a fatigue machine test, and a full-scale yard test are discussed in this paper.
Customer Papers












