Prefabricated Bridge Elements and Systems (PBES) are widely used in accelerated bridge construction (ABC). One such example is the Parkview Bridge located in Kalamazoo, Michigan. The bridge has four spans with AASHTO Type III girders and full-depth deck panels that are post-tensioned in the longitudinal direction after grouting the joints between panels and forming the longitudinal joint with cast-in-place concrete. Structural system behavior is further complicated due to skew and the continuous nature of the post-tensioned deck panels that are connected to the girders using a discrete stud system and grouted haunches.