GEOVIA Surveyor

Generate the daily survey requirements for the mine site by integrating and processing survey data from CMS, GPS and other traditional survey instrumentation, and update as-built mine geometry from reduced survey data.

  • Calculate total material handled, rehandled or filled
  • Set out or delineate locations and boundaries
  • Ensure compliance with survey‑related regulation or legislation
  • Publish the following measured survey data for use in the mining production process:
    • Survey control stations and reduced pickups
    • Mining infrastructure (buildings, roads, processing plants, etc.)
    • As-built maps of the mine, compared to the design
    • Monthly volumes mined/filled and broken (reconciliation)