GEOVIA Cave Mid-term Planner

Increase productivity and profits and achieve scheduling objectives by quickly and easily creating and analying scheduling scenarios

GEOVIA Cave Mid-term Planner enables the long and medium-term planning of a caving operation. Easily generate a production that allows you to improve the value of a project/mine while maintaining a practical mining plan and satisfying complex cave management logic adding multiples constraints, such as tonnage, grade and equipment performance.

  • Create realistic undercut sequences in PCBC with operational constraints
  • Design the undercut level with exact ring shapes and precise grades
  • Use alternative flow models to help determine the best model to be applied to any site situation
  • Have more flexibility in multi-lift caving environments
  • Obtain a complete residual block model directly after the analysis