GEOVIA Cave Long-term Planner

Create schedules that improve mine site operational productivity and profitability

GEOVIA Cave Long-term Planner enables the long and medium-term planning of a caving operation, including detail analysis per draw point, flow model analysis, and calibration. It also automatically generates tunnels for a cave design - both for Block and Sub-level Caves. 

  • Better grade modeling and forecasting by using multiple material mixing options
  • Evaluate long-term planning scenarios
  • Define minerable reserves, allowing for easy delineation of practical footprints as well as sensitivity studies of price and mining cost variations
  • Generate numerous production schedules to study the interaction of the key scheduling parameters
  • Run concurrent analysis of results in Microsoft Excel