
GEOVIA Cave Footprint Optimizer enables a quick study of different footprints at different elevations, useful for pre-feasibility studies. It allows for sequencing factored into discounted cash flow and multiple sector scheduling which includes multi-lift.
- Find the best elevation and orientation for locating a new extraction horizon for block and sub level caves
- Optimize the draw strategy for SLC
- Reduce risk for large capital projects by evaluation of multiple scenarios.
- Adjust the development rate, production rate, and mining sequence all within the Footprint Finder.