Discover the Profitability of End-to-End Mine Optimization

GEOVIA Whittle enables open pit mining companies to first accurately evaluate the financial viability of a mineral deposit and options for capital investment and development, then determine the optimal long-term strategic mine plan and schedule to extract the full value of that deposit over the life of the mine. Through a range of customizable components, including strategic scheduling, detailed cost, price, and recovery modelling, multiple scenario analyses, blending, cut-off and simultaneous stockpile optimization, Whittle empowers mines to achieve full, end-to-end mine optimization — a process proven to improve net present value well above pit optimization alone.

GEOVIA Whittle Roles

Discover the world’s most comprehensive strategic mine planning role-based portfolio for surface mining.

GEOVIA Pit Optimizer > Dassault Systemes

Pit Optimizer

Find the optimal mining strategy utilizing a combination of economic, physical, geotechnical and operational constraints.

  • Choose either Pseudoflow or Lerchs-Grossman (LG) algorithm to generate optimized pit shells
  • Utilize unparalleled toolkit for high level economic evaluation of new projects and operating open pit mines
  • Uncover and understand economic drivers and associated sensitivities
  • Focus on NPV maximization or resource recovery
  • Manage projects with an easy-to-use framework
  • Analyze multiple scenarios and elements with advanced reporting and charting
GEOVIA Blend Optimizer > Dassault Systemes

Blend Optimizer

Optimize blend considering the schedule and existing stockpiles to ensure these are optimized at the same time, driven by the overall objective of maximizing the Net Present Value (NPV) of the whole operation.

  • Blend optimization based on Whittle schedules or imported schedule
  • Bulk blend scenario analysis considering multiple products with different specifications, prices, blending costs and blending limits
  • Handle multiple coal specifications and constraints such as minimum BTU, max ash and sulphur
  • Perform extractive blend factoring in blending costs and constraints, such as process recovery, prices and selling costs while limits are applied to the extractive process
  • Handle multiple stockpiles, different cut-offs, time dependant recoveries, initial size and grade while utilizing Whittles scheduling engine to determine the optimal blend strategy

*Prerequisites: GEOVIA Pushback Optimizer

GEOVIA Multi Mine Optimizer > Dassault Systemes

Multi Mine Optimize

Perform a single optimization over a complex collection of mines all while maintaining individual work constraints for each mine. Producing a more realistic overall schedule from the different areas all within the one optimization framework.

  • Run a single optimization over a whole mining complex
  • Apply individual work constraints for each mine within a complex
  • Define unique physical constraints for each mine, such as mining width
  • Modify mining rate per mine in different scenarios
  • View, report and analyze all or individual mines in one go

*Prerequisites: GEOVIA Pushback Optimizer.  

GEOVIA Pushback Optimizer > Dassault Systemes

Pushback Optimizer

Create Strategic Mine Plans linking in Milawa’s Life of Mine Scheduling approach focused on NPV or material balance.

  • Determine best set of practical pushbacks or mining phases
  • Develop optimal and achievable life of mine schedules
  • Handle complex mining and processing constraints
  • Calculate NPV based on realistic schedules supporting up to 50 pushbacks
GEOVIA Simultaneous Optimizer > Dassault Systemes

Simultaneous Optimizer

Simultaneously optimize schedules, cut-offs, stockpiles and blend for the life of the operation. Find better outcomes compared to traditional methods resulting in higher Net Present Value (NPV) for the operation.

  • Increase NPV beyond multiple sequential optimization mechanisms
  • Simultaneously optimize the optimization mechanisms for cut-off, blending, stockpiling and sequencing to create the ultimate mine schedule
  • Make individual optimization mechanisms more accessible in a single step
  • Analyze and report using both standard Whittle outputs and advanced spreadsheet reporting
  • Handle 30 processing paths as well as capital or CAPEX optimization

*Prerequisites: GEOVIA Pushback Optimizer

Start Your Journey

The world of mining is changing. Discover how to stay a step ahead with GEOVIA

GEOVIA Strategic Mine Planning FAQ

Also Discover

GEOVIA 3DEXPERIENCE > Dassault Systemes
3DEXPERIENCE GEOVIA
Efficiently Design, Plan, and Optimize Mining Operations and Urban Centres
GEOVIA Surpac > Dassault Systemes
GEOVIA Surpac
Comprehensive Mine Planning and Geological Modelling Software
GEOVIA MineSched > Dassault Systemes
GEOVIA MineSched
Advanced Tactical Mine Planning & Scheduling 
GEOVIA Services > Dassault Systemes
GEOVIA Services Offering
Drive Efficiency and Maximize Productivity
GEOVIA Training > Dassault Systemes
GEOVIA Training
Training for Mining Professional Worldwide
GEOVIA Academia > Dassault Systemes
GEOVIA Academic License Program
Supporting Leaders of Tomorrow

Learn What GEOVIA Can Do for You

Speak with a GEOVIA expert to learn how our solutions enable seamless collaboration and sustainable innovation at organizations of every size.

Get Started

Courses and classes are available for students, academia, professionals and companies. Find the right GEOVIA training for you. 

Get Help

Find information on software & hardware certification, software downloads, user documentation, support contact and services offering