Safe Plant Decommissioning

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Donec ultrices libero non sem molestie tempor.

Safe Structure

Temporal structural integrity validation with simulation

The plant digital twin helps ensure worker health and safety during dismantling when temporary structures are created for some operations, while in others, the building is deconstructed throughout the decommissioning lifecycle.  Safe Plant Decommissioning delivers time dependent deconstruction building and temporary structures configurations as 3D data that are ready for simulating structural integrity, and to review and validate collapse-free deconstruction while radiation is always contained. 

Key Capabilities and Benefits:

  • Perform structural studies at any stage of the decommissioning phase and any configuration of the facility incl. non-linear structural studies
  • Perform decommissioning scenario study – in relation with Safe Scheduling above – allowing with structural integrity into account
  • Design temporary reinforcement structure in context of scenario study